The Medical Equipment Pre-assessment End User Training has launched in Dodowa. It took place at the conference hall of the old Dodowa District hospital on the 23rd June 2015. The training will take four weeks and all the current 157 clinical staff will be trained and assessed.
The launch was honoured with the presence of the GHS HR Director and the District Assembly head, who were full of praise of the programme and expressed their gratitude to Genelec and NMSI for the work well done so far.